Monday, January 8, 2024

WFS Connected

I finished construction of the removable staging section, and have connected the WFS with the OASIS District layout. Everything tested out perfectly.





I have decided to leave the tail track in place on the left side of the WFS instead of building a longer section. The extra 8 inches available doesn't help much, so no need to change things here.

The new staging area does not require scenery, but I will probably paint this a dark gray or black. It will also be hidden behind a low-level fascia board as well. Here's a video of the first test run of the connecting section.

I'm setting up a new tool to assist with operating the layout. More on that in the near future! 

Tom 

Monday, January 1, 2024

WFS New Shelf Home

I was able to install the shelf for the extension in my layout room this past Saturday. The original staging tracks for my Wetterau Food Services micro will be replaced with a new one that will connect the WFS warehouse with the OASIS District Layout situated around the corner. This original staging section will be used when the layout goes out to train shows in the future. 


Original Staging section will not be used on the home version 

Time to pick up some plywood and build the removable staging section so I can start running some trains!

The length of the staging track to the right of the overpass doesn't require much length to be functional for my needs. This will give me about 24 inches of space to the left to add additional staging if I wish. Still thinking about my options for this section. 

I have some flexibility on the left side of the WFS as well. My 16" tail track section that is used for train shows could be used, but my right side changes to staging means some additional space to use on the left side. I have 24" of shelf space, so I could add a turnout to create a short spur track. This would give me an additional industry for switching activities. I could also make this an additional hidden staging area for a local freight to exit stage left. Not sure which option I will choose. 

If all goes well, I could have the WFS connected to the OASIS District Layout within a week or two. We will see. Stay tuned! 

Tom